Taskforce Quality and Supply Chain
Within six weeks, critical quality issues in wiring harnesses were fully resolved using structured root cause analysis (8D, FMEA), KPI-based reporting, and targeted remediation measures. The supply chain was stabilized and defect-free production for the OEM was sustainably restored.
- Client
- German Automotive Tier2 / OEM
- Company size
- 3,500 employees (2024)
- Duration
- 2 months
- Role
- Taskforce Lead
- Country
- Germany; Slovakia
- Sponsor
- C-Level
A Tier2 supplier specialized in antenna wiring systems was facing critical quality issues that threatened the production capabilities of a premium OEM. Luxury vehicles were piling up post-EOL testing, production was at risk of being halted, and tensions between the OEM and supplier escalated. Previous internal troubleshooting efforts had failed, making a top-management-level taskforce intervention unavoidable.
Challenges
Initial situation, pain points, and setup:
-
Massive quality issues in wiring harnesses endangered both revenue and brand reputation of the OEM
-
Vehicle backlogs due to failed EOL testing and blocked outbound delivery
-
Prolonged root cause analysis at Tier2 with no actionable results
-
Breakdown in transparency and communication between OEM and Tier2
-
Lack of analytical rigor, structure, and implementation strength on the supplier side
Additional complexity:
-
The wiring harness is installed early in the production line – replacements post-assembly are costly and operationally complex
-
Dozens of customer-specific wiring harness variants per vehicle line made root cause identification highly challenging
-
The OEM classified the case as a critical escalation within its quality organization and assigned an internal problem-solving team
-
The taskforce was initiated at the OEM's request, with executive pressure on both sides
Objectives
-
Establish shared governance and formal de-escalation criteria
-
Rapid and accurate root cause identification using 8D methodology, Ishikawa diagrams, and FMEA
-
Immediate deployment of short- and mid-term corrective measures
-
Full cleanup and stabilization of the supply chain, including clean-point definition
-
Implementation of a robust KPI system for ongoing quality control
-
Eliminate production line holds at the OEM; verify impact via zero-defect performance at line and field level
-
Derive lessons learned for future collaboration and escalation handling
Approach
-
Joint kickoff with OEM and Tier2 supplier; formal alignment on scope and expectations
-
Setup of taskforce governance:
-
Daily operational stand-ups
-
Weekly SteerCo sessions with OEM and Tier2 leadership
-
-
Consolidation and reprioritization of all existing documentation and technical reports
-
In-depth review and challenge of all existing 8D reports using VDA standards
-
Clean-point definition prior to re-approval of shipments to OEM production lines
-
On-site plant visit and process analysis at Tier2 site in Slovakia
-
Data consolidation and gap analysis across all error sources
-
Definition and implementation of clear KPI logic
-
On-site validation of processes at OEM manufacturing site in Germany
-
Stakeholder interviews across Tier2 and OEM engineering, quality, and logistics
-
Early involvement of Tier1 suppliers in root cause and supply chain risk assessments
-
Systematic data analysis combining:
-
Production output, quality claims, defect patterns
-
CT simulations and impact validation
-
High/low runner analysis by part number
-
-
Iterative update and completion of 8D reports per OEM evaluation logic
-
Coordination of corrective and preventive actions within the quality management system
-
Refinement of the FMEA and issue escalation workflows
-
Evaluation of new QMS tooling per VDA standards
-
Volume planning for new vehicle lines and automation steps to ensure future process reliability
Obstacles
-
Initial resistance of Tier2 to external intervention and quality escalation
-
Internal belief that all root causes had already been resolved
-
Friction between Tier2 and Tier1 suppliers; lack of alignment in root cause responsibilities
-
Overstretched Tier2 project team due to sustained quality and production pressure
-
Lack of transparency around real-time quality status, stock levels, and action progress
-
No unified or up-to-date KPI reporting structure in place
-
Complex defect picture across many custom wiring harness variants
-
Each variant required individual root cause analysis and process tracing
-
Differing interpretations of FMEA and 8D reports between OEM and Tier2
-
Negotiations required to align and standardize root cause analysis logic based on OEM quality criteria
Critical success factors
-
Transparency & Analytics
-
Immediate structured on-site diagnostics from day one
-
Systematic challenge of all prior 8D reports and root cause logic
-
Consolidated data modeling across production, quality, and complaints to build robust hypotheses
-
-
Governance & Control
-
Daily taskforce stand-ups for rapid decision-making
-
Weekly C-level SteerCo for top management alignment
-
Unified KPI dashboard for progress tracking and issue resolution
-
-
Stakeholder Management & Communication
-
Neutral, outcome-driven dialogue between OEM, Tier2, and Tier1 in "OEM language"
-
Proactive conflict resolution and trust-building across all parties
-
Clear escalation pathways and alignment loops across all levels
-
-
Execution Capability
-
Hands-on mindset with rapid prioritization of quick wins
-
Parallel implementation of immediate and long-term actions
-
Clear ownership on the Tier2 side to ensure sustainable change
-
-
Sustainability & Safeguarding
-
Finalization and standardization of 8D and FMEA reports per OEM/VDA criteria
-
Process corrections implemented to ensure zero-defect delivery
-
Structural quality management improvements
-
Data-driven steering model for future prevention
-
Joint definition of escalation playbooks for future collaboration
-
Key results
-
All defect types fully eliminated within six weeks
-
No faulty parts in production, stock, or outbound deliveries – clean-point validated
-
OEM production line reauthorized for full operations
-
Complete stabilization of production and upstream supply chain
-
Full transparency across inventory, production, and failure metrics
-
Structural improvements to Tier2 quality management (FMEA, 8D, complaint handling)
-
Implementation of a KPI-based steering model for continuous control
-
Risk exposure minimized through early prevention and data governance
-
OEM-Tier2 relationship sustainably improved
-
Conflicts resolved and joint escalation management logic institutionalized